Macclesfield
Nub News Logo
Nub News

Main road from Macclesfield to Buxton facing six months of road closures

Local News by Matthew Hancock-Bruce 16th Jul 2026   1
The Cat and Fiddle is set to face six months of road closures (Credit: Google Maps)
The Cat and Fiddle is set to face six months of road closures (Credit: Google Maps)
advertisement

The main road from Macclesfield to Buxton is facing six months of road closures

Derbyshire County Council has confirmed that major improvements are being made to a 2.8km stretch of the A54, known locally as the Cat and Fiddle.

The work, split into two phases, will impact the road from its junction with the A53 Leek Road to its junction with the A537 on the border with Cheshire.

"As the works are extensive, needing major excavations across the full width of the road and the use of large equipment and machinery, the A54 Macclesfield Main Road will be closed to all traffic during both construction phases," reads the Derbyshire County Council website.

"The closure is needed for the safety of the public and our contractor.

"Access will be maintained for properties and businesses only on the route.

Map of the A54 Macclesfield Main Road closures showing phase one and phase two closures (Credit: DCC)

The project has been split into two phases.

advertisement

Phase one will require a 14-week full road closure from Monday, July 27, until Friday, October 30, and will focus on road and drainage improvements ahead of the challenging winter weather conditions.

This includes resurfacing the road between the junction with the A537 at the county border, and where the hill known as 'The Terret' meets the road.

Meanwhile, a new drainage system will be installed to make sure rainwater drains away from the road surface to minimise surface water flooding.

Phase two is expected begin in April 2027 and will last approximately 12 weeks.

This phase of the project will include:

  • Reinforcing the earth banks to make them more stable and less likely to collapse. This will reduce the risk of falling debris or loose rock falling on to the road
  • Installation of new and repairs to existing safety barriers and bike guards
  • Completion of the remaining road resurfacing improvements from the junction with the A53 Leek Road and where the hill known as "The Terret" meets the road
  • Replacement of existing drainage culverts, the structures and channels that carry water beneath the road, to reduce surface water collecting on the A54

Derbyshire County Council has warned that the road closure will affect bus services 58 and 60 between Macclesfield and Buxton.

A signed diversionary route is also in place using the A53, A523, A537 and the A54.

     

CHECK OUT OUR Jobs Section HERE!
macclesfield vacancies updated hourly!
Click here to see more: macclesfield jobs

     

The Ball is in your court. Our long-term GOAL
is to help our local community to grow.

On our part, we are making a connection between local news, local people and local businesses.
This connection is the key to community success.

Now the ball is in your court.
You can support us with a small payment or at least read us for free.
Take a shot yourself and then pass the ball to your friends!
Monthly supporters will enjoy:
Ad-free experience
advertisement

Share:

Comments (1)

Post comment

Bjthraves

No mention of the route that the 58 bus will take from Macclesfield back to Buxton


advertisement

Sign-up for our FREE newsletter...

We want to provide macclesfield with more and more clickbait-free news.

     

...or become a Supporter.
Macclesfield. Your Town. Your News.

Local news is essential for our community — but it needs your support.
Your donation makes a real difference.
For monthly donators:
Ad-free experience